BeschreibungCAMPUS - Military Data Center (52105738647).jpg
The back of the new data center on the military training area in Frauenfeld. The building has a base area of 4100 m2 without the surroundings. CAMPUS is one of three data centers that has started it's basic operations in January 2021. The second plant, <a href="https://www.flickr.com/photos/kecko/46806064095/">FUNDAMENT</a>, was launched a bit before. It's built into the mountain and secret. The third data center, KASTRO II, is not yet built and will be ready maybe in 2028/30. It also has full military protection and is also secret. For safety reasons (power failure, earthquake), all three plants are far apart from each other, 100 km or more. There must also be no nuclear power plant or dam nearby. Switzerland, May 27, 2022. (4/4)
verbreitet werden – vervielfältigt, verbreitet und öffentlich zugänglich gemacht werden
neu zusammengestellt werden – abgewandelt und bearbeitet werden
Zu den folgenden Bedingungen:
Namensnennung – Du musst angemessene Urheber- und Rechteangaben machen, einen Link zur Lizenz beifügen und angeben, ob Änderungen vorgenommen wurden. Diese Angaben dürfen in jeder angemessenen Art und Weise gemacht werden, allerdings nicht so, dass der Eindruck entsteht, der Lizenzgeber unterstütze gerade dich oder deine Nutzung besonders.
https://creativecommons.org/licenses/by/2.0CC BY 2.0 Creative Commons Attribution 2.0 truetrue
Diese Bilddatei wurde ursprünglich auf Flickr durch Welcome to Switzerland backstage! in https://flickr.com/photos/70981241@N00/52105738647 hochgeladen. Sie wurde am 30. Mai 2022 durch den FlickreviewR 2-Bot geprüft und die Lizenzierung der Datei unter den Bedingungen von cc-by-2.0 wurde bestätigt.
30. Mai 2022
Kurzbeschreibungen
Ergänze eine einzeilige Erklärung, was diese Datei darstellt.